Featured Projects

2020 Kitchen Renovation 

This kitchen renovation was a complete overhaul from high quality vinyl plank laminate flooring, new drywall, new pot lights and hanging light fixtures, new cabinetry and new counter tops.

A new counter top island was installed in the middle of the room.

Doors were refinished.

All appliances will be enclosed in new cabinetry.

 

Floor Installation 

Before installing laminate or hardwood flooring, the concrete below must be even and level. Any conduits coming up through the concrete must be measured and fitted with precision. There is no margin for error.

Once the floor is installed, if the rest of the construction is not finished, the new floor must be completely covered to prevent scratching and marking while the other trades complete their tasks.

This top quality laminate flooring was installed from the concrete up in a dental office then completely covered so other work could continue without damaging the new floor.

Golf Course Club House Renovations 

The existing space was modified to contain two new storage rooms, a relocated golf club repair shop, a new women’s locker room and a new office. Several new walls were added and three new doors were framed in and hung to accommodate the new rooms.

All of the new walls and door frames were primed and painted and several existing walls and door frames were given fresh coats of matching paint.

A second golf club storage locker room and security door was built on the back end of the starters hut. 

Dental Office Build Progression

Nemsta specializes in Dental and Medical offices from the bare walls out. Where necessary we apply leaded drywall to contain radiation from X-Ray machines.

Depending on the requirements, there can be several styles of “operating rooms”, offices, coffee rooms, washrooms and reception areas.

Hospital, medical and dental office construction is a niche that Nemsta Construction has mastered.